Case 2: manufacture of brick from the kiln and pagoda by using a system of fluid-bed furnace enclosure. Instead of the conventional sintering yield because of the cost of the project's rate of return over the period and a shorter payback.
The second was to produce bricks from the kiln incinerator Pagoda using Fluid in the bed. Instead of burning conventional yields because of the cost. The yield of this project The payback period is shorter.
The 2. The production of kiln brick pagoda using the system from the furnace, fluidized bed Instead of burning plain because of the rate of return on the cost. Rate of return on the project. And the payback period shorter.