-Open the compressor 1 and 2 off the compressor and meter readings.-Crack the image of God is the head of the factory.-Change the bulb fan produced 1.-Turn off the compressor.
- open air compressor 2 and close 1 and read the meter air compressor. - color keying the king. In front of the factory. - change the light bulb, fan, produced 1 - . Close air compressor.