The security standard tensile test in wire rope, 1 million times by using normal tensile strength 10 tons, there is no problem and requires a tensile strength up to 27 tons of wire rope to lack but just 1%. In addition, testing of wind Vibrations, wind direction, including the installation of the measuring instruments 24-hours to see abnormalities that may occur. Bridge of Rama 8 bridge stretched the asymmetric top 5 of the world. Germany, which is ranked the second country to 3 bridges and Nepal with countries from the length of the interval the bridge bridge bridge of Rama, which is 9 the first stretched but is symmetric, because there are 2 poles considered the # 18 of the world. By counting the length range of bridge. 450 meters. The striking beauty that occurs. Blending traditional Thai art, from concept to creation to be the Royal tributes honor King Mongkut Phra Somdet ponmen tharom find Ananda Mahidol. The reign of 8 Bangkok. "lanchakon Act", which became the template symbols in architectural design. The various components of a bridge emphasises transparency, some simple and beautiful. The materials used in the construction of the bridge suited to environments such as high mast in Y-shaped bridge is a reinforced concrete pole upside down. Serve to carry other important structures of the bridge section, which is visible in the distance, the distance has been designing layout, branding of the Ruen Kaew. Handrail which is made of metal, designed as a fine and delicate patterns. After the Lotus and Lotus pillar structure under slabs decorated with patterns. The Lotus from using lightweight materials. Qualified help to reflect light into the skin under the elevated highway traffic. Help brighten the area under the elevated highway, and to conserve electricity at night. Something special of Rama, another bridge, a bridge in Bangkok 8 has not yet, however, is that the tip mast height of the bridge there will be views. Which has a glass-enclosed metal structures similar to the Lotus 165 meters high from the ground or as high as the building? 35 square meters area floor printer Capacity each almost 50 people, which will be open to the general public, but the construction of this section will be completed later in conjunction with a lift of disabled people, which is located at the corner of 2 River approximately in September due to high mast structure is the prototype Y turned upside down spots for viewing landscapes a work.We lift installations both in the vertical and oblique as oblique from the ground 80 m before then, another 155 m vertical, but trucks have about 5 people take 2-3 minutes, up and down, there is also a lift each side to plain was used for administrative officers and patrol the bridge.
การแปล กรุณารอสักครู่..