Whatever type of generator 1.6.1 (Standby Generator Type) this type of generator is used as the primary power level is when a student who has no time for use when it is necessary or an emergency generator is important that availability is a major. Used for high-rise buildings Factories continued to produce results. This type of generator will need to meet your needs quickly. With precision accuracy, and is designed to use the full capacity of the engine to use powered generator and generator of this type will not be able to afford overload capacity. Working hours must not exceed the manufacturer's rated engine such as defined does not exceed 150 or 200 hours per year, and each machine is subject to the manufacturer's specifications, in a 12-hour cycle must be stopped for 1 hour, etc. ++ 1.6.2 generator continuous backup type (Continuous Generator Type) is being backed up, but can be used continuously when the primary electrical power outage, primary level, for example, if longer than 12 hours is used to load the stream started high. This type of generator capacity is higher than the price slightly higher than the first because the design will need to select the engine whose horsepower is enough or, and you can get a 10% overload capacity is according to the standard IEC and other standards are used to hard work and a half will need to consider the durability of the insulation and the temperature of the generator. 1.6.3 is the primary cost type generator (Base load Generator) is the main active power cost. Can be used continuously without limiting working hours. The coordinates of the machine must be loaded, as 70% of the types and 60% of whatever type is continuous. Machines of this type are often used in the Islands or places a temporary, such as electricity, oil drilling platform with the coil. Camp construction, etc., are sometimes required to install two power supplies in parallel and alternate work so that the maintenance of the defined intervals.
การแปล กรุณารอสักครู่..
