On January 29, I attended a meeting with the factory about the wiring closet to plug the device SERVER concluded that the CPD must be met before what to do
if the CPD, let us do it. We have prepared the following equipment
: 1. wire size 6x3 mm. concluded that Wait on CPD Meeting Before we do that to the conclusion that the Cabinet Wiring About Plug with Cable Form to DB Server.
การแปล กรุณารอสักครู่..