the plate design by modeling the flow of an office of high pressure water through a sheet of an office and analyzed with Solidworks program. Flow Simulation 2013 then selected sheet suitable to use as an office
.In the practice of above will result in the damage prevention of tube sheet, the ออริฟิส And reduce maintenance.
.In the second part of the project is the use of water balance of power plant, 2 KK By means of collecting data from various sources, which received approval from the Bureau of plant 2 KK irrigation at 10.54.400 cubic meters / day and drainage out of the factory, no more than 10 000 cubic meters / day
.Establishing balance water use is to determine whether The water entering the factory being used in any activity. The water factories out of any channel and water - out of the factory were equal or not!