Over the past week, and the customer had problems again, which is quite a lot about the plastic case that the original problem was HK10 scrap plastic overflow and stamping as the butt.Plastic debris that overflow work open 3 boxes 3 boxes, in which experiencing this problem through corrective action response ever to QA, and through the MMC that the inspection.But it still has a problem with dropped towards the customer.Now, the way Japan ceo of MMC is quite a problem because Syria sakap MMC tool emphasizes the quality of the production.The way ceo Japan informed that next year may have to consider moving to another wholesaler supplier to the mold which can provide the management of the La city into it to clarify access guidelines for the audit work, and how to solve the problem in the future.
การแปล กรุณารอสักครู่..
