Evaluation of the effects of actions; The rain water runoff in the path of potential road to L53-G production base into a hole by the entrance road is a lateritic road-Crusher 2 channel. Width approx. 6 m have approximately 1 percent slope and will adjust the reclamation area, the highest flood level in the area. By the entrance road was designed and built according to the standard of the Pan Orient.
การแปล กรุณารอสักครู่..
