From the tractor to repair welding light. The driver will be told that the job can be done or not.
Anyhow, the point on the tail, the head of the Sub Survey to be controlled to work properly. Avoid damage to the power system as follows.
portion of GATE SURVEY 1.) glue line of welding be close to the point as possible, and the length must not exceed 1 meter. 2.) grounded to glue the tube into the tank down. soil and the clamping area is only iron. Have not clip the area where the lumpy paint or grease.
การแปล กรุณารอสักครู่..
