As a result of the condominium boathouse Hua B detected the pool on top. The adjacent to the building water level down from the normal quantity. The lowest level decreased until the tiles from the edge of the sheet 2 on.In the swimming pool. Tend to be damaged and can be the cause of water leakage, such as nozzle water head water แนวต่อ. Under joint pipe lamp pool, the pool pump system Reservior as used to report it.The absorption of the ink drops to test the water until found. The ink has ooze out along the corner on tile pool. The north side next to the island in the middle of the pool, such as illustrations) (
.
.However, because of the building. Still in the guarantee structure and project developers in 5 years entity.Start to proceed on the basic 5 November 2557 performed about 7 days. , which must be cut down to about 3 tiles. The need to close service pool. Development and announced to the co-owner Roger next
.
การแปล กรุณารอสักครู่..