Section A: for every situation, adopted the plan BCP (Plan Activation).Section B: the loss / damage to the pipe tong. (including the loss / damage of documents) (Loss of Workplace covering Loss of Vital Records).Section C: loss of important personnel (Loss of Key Personnel).Category: the failure of the system, it (Loss of IT System).Category: provider and main color is not available (Failure of Key Dependency).
การแปล กรุณารอสักครู่..