The bridge project is the lift
needs (Machinery Frame) and a winch to be apart. Hold together by bolts 8.8 grade nickel plating, installation
.To install the first synchronized position of second stage concrete On the need to show the coordinates for the honest. To install a winch to direct in position.
การแปล กรุณารอสักครู่..