From the flowchart of the production process, show that prior to installation of the clean technology
sector of Line 1. Frozen water has been used 228 Q / week found that the amount of water lost during processing, 1:11 p.m. Q / Week 2. . In the offline preparation material with the use of water 147.40 Q / week and Resin 44.35 Q / week found that the amount of water lost during the process of preparing raw materials commonly used 16.14 Q / week and resin 8.51 Q /. Week 3. The line mixes with the water, generally 26 Q / week and Resin 1,121.30 Q / week found that the amount of water lost during the process, water is generally used 12.91 Q / week and resins 13.04 Q / week. 4. In the final part The concentration of the water line 35.80 Q / week showed a loss of water during the process 9.46 Q / week Moreover, in all parts of the production line, causing sewage 764.37 Q / week.
การแปล กรุณารอสักครู่..