1. No fire in the area is strictly prohibited in any case, in the area of bulk solid waste2 face must be small, should not have to open the front headquarters. Planning and management jobs properly, and the implementation of it.3. The thickness of the solid waste in landfills. Should not be more than me, thickness of 50 cm, and there will be การบด compression.4. There is a veil over with thick soil is divided into two stages for about 15 cm except the last layer to cover over with soil thickness at least 60 cm.5. Systematic collect rain water separator and waste arising from the bulk to handle properly.6. Access roads in good condition, able to use every season.7. The fence surrounding the area bulk disposal and entrance area.8. The data record into the area of waste disposal.9. Quality monitoring10. Staff. The right equipment in operation.