Regarding the installation of the passenger hoist for STR-106-004 discussed with Saipem, we wanted to know the location of the bracing tied to the permanent structure for recalculation. This must be supported by Saipem.
Regarding the installation of the STR-106-004 passenger elevator discussed with Saipem, we would like to know the support position of the fixed structure for recalculation. We must obtain the support of Sepem.
Regarding the installation of STR-106-004 passenger crane discussed with Saipem, we want to know the hanging position of the fixed structure for recalculation, which needs the support of Saipem.