1. ceiling installation work, ceiling structures cannot continue installing reinforced and T-BAR because the wait for a small way IRPC. Check the upper wall and the various systems have no top. And lab IRPC Check the walls for various system do not have to check the fire extinguisher system is waiting for the installation of the system and fix the installation pipes. And yet, there are no Te saraeng Dan cracked wall waiting and various structures.