The Task Leader to replace an employee (due to an Operator to bathroom) at a wind-gun 2 using UTN1 blow off steel remnants from a steel Jig dryers now have fall into the cavity inside the nose.
Leader to work instead of employees. (Operator employees due to the toilet) UTN1-2 using the machine guns, air conditioning scrap scrap out of the Jig, which currently has splashed into the nasal cavity.
Leader into working for employee (because of the employees Operator restroom) the UTN1-2 machine by using air blow gun scrap exit Jig which while blowing scrap can bounce off inside the nasal cavity