2.), let the budget review as follows: 2.1 according to the environmental report (1) 1975 total limit, 000.00 baht. If you perform original, supplementary, and dredge ponds khandin and also it is necessary to have any.Digging a pond polluted water. 2.2 as notified The text (2) concrete road surface work to review again if necessary, must be performed. In this season, and if it is necessary to consider the thickness of the asphalt and check price/The new unit. 2.3 according to the notification That (4) and (5) the budget is quite high. I'd consider the car's strong,To save the budget. ** In the canteen prices are somewhat too high. I'd consider.2.3 according to the notification The message (10) ask send details to come.2.4 BOILER departments. The large BOILER OVERHAUL 6 tons. agreed in principle. But asked to consider in detail and clearly2.5 the Department of raw material 1. to change the scale Consider that just before 1 only. ** It is not allowed to change all at once, so ask yourself 2 work description added. 2. building farmer and measured the percentage asked to pass on the information contains.
การแปล กรุณารอสักครู่..