The reservoir strike Due to the initiative Huay Lam district Tao Ngoi District. Sakon
administrator Wednesday, 11 September 2013 19:47
The reservoir strike. Due to the initiative
Huay Lam. Sub-moon Ban Tao Ngoi, Sakon Nakhon
works. :
King
works:
one on 17 November 2532 by His Majesty the King about the development. Various irrigation projects The completion of the construction is finished. Parliament should deal Water is used correctly and maximum benefit. The agencies The organization operates
two. On April 24, 2551 His Majesty the King. His Majesty the project reservoir strike. Province, there are not enough people take advantage. A large reservoir of water, but no use of water as they should. Worries about water use The reservoir has a capacity beating them 22 million cubic meters
a. :
King has completed Prarachdmenin looked Creek watershed beating and His Majesty on November 28, 2524 the Department consider placing the project and construction of reservoir strike quickly. To supply water to the farmland. Representatives of the little village, home, moon, marshes and nearby villages in the district for Tao Ngoi. Sakon nakonn Can be cultivated in the rainy season - the dry season. And water for consumption - consumption. For the people in the village all year round,
Irrigation Department has taken a beating in response to reservoir construction works are characterized by the construction of a dam blocking the creek strike. Ban Huai Lam District Tao Ngoi Tao Ngoi District, Sakon Nakhon. A 26 meter long, 395 meter high dam reservoir capacity of about 21 million cubic meters. Surface area of approximately 1,200 acres and building drainage of open gutters. There's the spillway length 35 meter hose left diameter of 0.90 meters and surf water right diameter 0.30 meters and completion of construction water delivery system consisting of canals Number 7 line has a total length of 19.6 kilometers, construction began last year. in 2526 and completed in 2530 included the construction of a total of 105.40 million baht water to about 8,000 acres of farmland request of five villages in the district and parish Tao Ngoi moon. Establishment of water users farmers to participate in water management group of seven
current situation. The current water storage (as at October 29, 2556) 19.30 billion cubic meters, equivalent to 92%
- the crop season of 2556
is 7,340 acres of rice
- the crop year drought 55 /. 56 Total 1,559 hectares
divided into 571 hectares of rice
crops, 515 acres,
145 acres of tomatoes,
fish ponds, 114 acres,
241 acres more about
the project. :
Sub-moon Ban Tao Ngoi, Sakon Nakhon
project objectives. :
1. to allow farmers to take advantage of the irrigated area fully
2. To enhance the learning
3. To associate all sectors participating
beneficiaries. :
People little village, home moon, marshes and nearby villages in the district for Tao Ngoi. Sakon
details of the project
and the building structure
- a dam blocking the creek strike (Kam River Basin)
- Coordinates 5842 IV 48 QVD 120-720 liable or three hundred twelve thousand one hundred E UTM N the 1,872,200th
- began construction in 2526 and completed. year 2530
- a wide, 6.00 meters high dam at 395 meters, 26.00 meters
- 49.00 sq km area of rain
- the amount of water flowing into the basin's annual average of 74 million cubic meters
- the latter +209.50 soil bunds. m. - the Thok.
- maximum water level +209.20 m. - the Thok.
- the water catchment +207.50 m. - the Thok.
- low water level +192.50 m. - the Thok.
- High water volume of 24.00 million. cubic meters
- the volume of water stored 21.00 million cubic meters
- the minimum volume of 1.285 million cubic meters of water
- the surface area of 1.800 square kilometers of catchment
- shaped outlet type U (reinforced concrete. ) measuring 550.50 meters long, 33.00 meters of
water and drainage systems.