As a part of the MDF project t have installed conveyor chain conveyor for ash ash from energy plant for a period of one term found that there was a problem due to bad design is, ball bearings, gear, chain, soak in water at any time, for example, makes such parts
.Results Very often heavy repairs to damaged, more than 10 times from work for about 1 years
therefore deemed appropriate change belt conveyor systems conveyor ashes is designed in such a way that the wheels press the only belt, dipped in water,
.Contruction Engineering companies and APT design quote can install 1670000 baht.