Inquire to confirm the boundaries of the building, floors 4-6. Due to system work (Grill Air requires space between the wall and the precast), the wall must be moved away from the For-Con model at a distance of 250 mm.
In order to confirm the architectural scope of the 4th to 6th floors, due to the space required for grid air, the walls and prefabricated walls must be removed from the design. For 250 mm connections.
Ask to confirm the boundary of the 4-6 floor building. Because the system works (Greer air needs space, spacing, wall and pre-broadcast), the wall must be moved out of For-Con with a distance of 250 mm. Yes