Therefore, the construction operations plan with finished concrete piece, it should consider the resources used in construction. The relationship between the various activities. To reduce the problem of inconsistencies between the planned construction and operation in the construction of high-rise buildings with the finished concrete piece.
การแปล กรุณารอสักครู่..
