By Mr. Toda 1. explain the difference of part 2 production version.2. try changing the sequence from 1 → 2 → 3 process (to start the process takes lot before).3. Down: time part time cycle it is in rework,% A,% P, and monitoring.4. Down time: teaching part caused by work, or anything that is not the same. Make a new connection must be aligned.By Mr. Narongsak1. check the datum and PIN jig2. Check data value, non-value 3. lot Spatter may cause head nozzle gas flow and makes tons of bad check, This direct with4. place the tank welding may cause down time if all welding wire (not appropriate).