The location of the project.The head of the dam the Canal, THA ngio. Located on a canal, THA ngio In the district, Tambon Khlong tha ngio district, Trang province.Construction period of 7 years (2537 – 2543) 18.50 million cubic metres capacity.
การแปล กรุณารอสักครู่..
