-The owner provided access by car and prepare for boring positions working outreach. -If the job is basically a nokonkrit page. Owner, pound ground nokonkrit
- Prepare the car owner to position drill water exploration and preparation work for the field. - in front of a concrete slab. Owner smashed concrete floor
- owners prepare driveway to the drilling position survey and provide water for use for work in the field. - case face is นคอน Crete The break ground นคอน Crete