The elements of the furnaces are designed to have two rooms burnt, the combustion 1 resembles a rectangular curved roof. In front of a gate for entering the waste containers, which can be used to lift the tail into the combustion chamber. Inside the sieve to support solid waste and air supply for combustion air input to the North in flames (Overfire air) and below the flames (Underfire air) control the burning process, air is settled. Approximately 120 – 150 per cent of the quantity of air required by the hypothesis (Stoichiometric) solid waste shall be fire and ignited combustible oil on your own or use help getting caught fire. When waste can be burnt by itself. Burns will be in accordance with the principle of burning the excess air. The exhaust gases and floating into the second combustion chamber to burn again in a second combustion chamber resembles a cylindrical combustion chamber installs first North. Contains burn and pay the estimated quantity air 140 – 200 percent of the air required for combustion theory is completely gone and the time it takes to burn (residence time or retention time) not less than 1 second pollution treatment system used for cyclone trap large dust.Steps to work.Operation of kiln dried solid waste through waste separation, wet out. Can destroy the dry waste 1000 kg at a time by entering a single waste by combustion chamber design which can accommodate 1, dry waste is 1000 kg, which is at the heart of the burning process caused by the burn 1 burn the excess air by yourself without using head burn-help? The combustion chamber part 2 working the excess air, but have destroyed the gas temperatures to help Cook, no less than 1000° c. Throughout the performance.
การแปล กรุณารอสักครู่..
