Based on a sample of EX-150 Model 240 pieces of work: all 3000 pieces from Out-going according to AQL standards 0.4 (Ac 1 Re 2) on 25/3/2015 standard 4 NG work found a piece set to Reject, but let through.It.
From sampling and Model: EX-150 240 pieces of 3,000 pieces Out- going according to AQL 0.4 (Ac 1 Re 2) on 03/25/2015 found NG 4 pieces, which set standards but must Reject. To release through such
The work sampling Model: EX-150 number 240 pieces from all 3 000 pieces, that Out - going standard AQL 0.4 (Ac 1 Re 2). On 25 / 3 / 2015 found NG 4 piece which is set to the standard Reject but leave through such