Vendors will need to perform a clean installation of machinery and equipment by connecting it to the system and that productivity is associated with the plant, tobacco, prepared by the topic of system productivity 3.9.4.
The seller must install the equipment by connecting to the auxiliary systems and manufacturing systems which are related to the provision in Section 3.9.4 Tobacco production system accessories.
The seller must install machinery and equipment by connected to the auxiliary systems, production and related systems in which the tobacco factory provided. According to topic 3.9.4 reinforcement system production.