เมื่อนำPseudo cross-section 4 lines มาวิเคราะห์ร่วมกับ lithologic log data and electric log data ( Figure 5.15 and appendix C1)ทำให้สามารถ established Geo-electrical cross-section ได้ดังรูป 5.16,5.17, 5.18 and 5.19
When the Pseudo cross-section analyzed in conjunction with the 4 lines lithologic and electric log data log data (Figure 5.15 and appendix C1) makes it possible to established the cross-section image Geo-electrical 5.16 5.17 5.18 5.19, and,
When Pseudo cross-section 4 lines were analyzed together with the lithologic log data and electric log data (Figure 5.15 and appendix C1) can be established Geo-electrical cross-section Figure 5.16,5.17, 5.18 and 5.19.
When the Pseudo cross-section 4 lines were analyzed with lithologic log data and electric log data (Figure 5.15 and appendix. C1) can be established Geo-electrical cross-section has shown 5.16 5.17 5.18 and 5.19,,,