If you find that the result of the second Follow-Up was not able to arrange all of NC, with close to repel the QMR
condition. The following:
a), examine the NC has not been edited in internal quality monitoring next time
.(B)), make out CAR operation procedures regarding operation prevention (P-QA-08), according to the amendment, the NC
anyway
5.8. To track the effectiveness of a monitoring
5.8.1 who is QMR to evaluate the effectiveness of the internal quality monitoring everyone's
5.8.2. The method used in the evaluation: the query method for internal quality monitoring, Information on preparation, or between internal quality monitoring and reporting topics considered by the NC quality monitoring within them to consider appropriate
5.8.3 If the QMR errors found in the monitoring of the internal quality monitoring (IQA) Any one fault, clarification of the QMR found it along with the complete task tracking very closely to ensure that the IQA. 5.8.4 management representative (QMR) can consider withdrawal, quality monitoring users within any one. If you find it inappropriate or not powerful enough and direct impact on the quality and safety of the product (s)
5.9. na offers quality monitoring results within the Conference for the review of the management, according to David flow operation. Review of quality system by the management (P-QA-10)
การแปล กรุณารอสักครู่..
