Irrigation Department has conducted a detailed study and survey design, project construction of canals, reservoirs and water delivery systems, including Opera posture, length approximately 13.10 km completed, b.e. 2543 by ridges reservoir.The dam width 8 m long, 330 meters high and 40 meters of water can be entrapped 18.50 million cubic meters.
การแปล กรุณารอสักครู่..