Pour the plaster ground after leveling sand or plaster wall, primer, curing for 24 hours throughout the 3 days.Leave it to dry and then a floor tile or began to penetrate the walls basic specification.
After pouring cement leveling. Plaster wall or foundation, then 24 hours after incubation for 3 days left to dry. Then embark on a tiled floor. Or tile lining the walls
After pouring floor, cement, sand, fine level. Plastering wall or foundation and 24 hours. The curing throughout the 3 day to dry. Then its tiled floor or lining wall tiles.