Note: The above guidelines are based on international standards of good practice, however, banks. Each one has a business policy. Plan IT investment transaction volumes
and the impact on different business projects in Phase 2 in 2557, BOT. to study a practice acceptable (Acceptable Practices) and assess the
Gap with banks. Each of the order. guide bot. and banks. Together, consider the appropriateness of the plan to improve their IT systems to meet
international standards. Both in the short and longer term.
การแปล กรุณารอสักครู่..
