Until 1990, the growth of population and development, on the Kitsap peninsula, as a result, traffic on the bridge over the limit that the bridge was designed. Construction began in 2002 and the new bridge opened to cater for the traffic moving East. Later, the bridge was redesigned to accommodate the traffic towards the West.
การแปล กรุณารอสักครู่..
