Activities at the first pit house villages (4x5 meter) pit stall semi - semi-cement
materials and equipment. Price (THB)
1). Zinc (10 ft 45 pads) feet each 17 Baht 7650
2). Wood Bolt (12 volumes, size 12 feet) -
3). Coatings (3, 12 cubits) -
4). Not barrier. Ceiling (seven volumes, size 12 feet) -
5). Do not make the stall (8 volumes, size 12 feet) -
6). Maisie (size 2 feet) lot -
7). The pole (9 from 7 feet) -
8. ). Cement (Portland), number eight children per 130 THB 1,040
9.) concrete blocks 25 pack of 8 THB 200
10.) pipe threaded plastic 4 shares 1 10
11). PVC pipe size 4 inch one. 45 of
12). The tape 1 15
13). adhesive tube. 30
14). 100 liter plastic water tank with tap water. 550
15). 3,4,5 finger nail sized at 3 per kg per THB 450 50
16). Galvanized nails 15 baht per box 20 300
17). rock and sand, each one ship vehicles per 1,500 baht. (6 wheels) 3,000
Total 13,290
Notes for each piglet 1400 baht (approximately).