Ship date 07/06 the cable ship, the vessel will be informed that any delay to the date 2/06. Sachueng service cable for lash vessels less delay and another out of the Bangkok port. The ship will be released 10/06 which would delay less. Interference, sister of air loaded date 09/06 instead lol.
การแปล กรุณารอสักครู่..
