-3-5 days after the installation can support full implementation according to the properties of the materials specified in the Technical Datasheet and can be cleaned with water or wash the floor.
- 3-5 days after installation can support fully the properties of the materials identified in the Technical Datasheet and can be washed with water or wash the floor.
- 3-5 days after installation is compatible with fully according to material properties specified in the Technical Datasheet and can be cleaned with water or polish the floor.