1. the patient is sitting or lying by the foot of the patient is moved to the same level of resistance above all hoist 2.2. the patient per device.-At the end of the rope through the pulley at the top loop 1 (on the right hand side of the patient) and the side rope tied end tribute to handle.-Apply fabric pieces 1 thousand at the ankles to tighten to prevent injury when there is a soft fabric because of the management.-2 pieces of fabric (with a band that has infected lakkhana with ropes) cloth over the foot, the ankle is a fabric which is transcribed with the fabric piece I immediately. After that, adjust the strap, tighten-End the loop through the pulley and remove the two end sides tribute to mud with hand grip (left hand side of the patient).3. the executive body. 3.1 management of the left leg.-The patient pull the left hand so that the left leg is unfolded.-After that, offering tensile strength on the left and then draw the right replacement switch so that the left leg is in the Valley, or into the original position. 3.2 management of the right leg.-Pull the handlebar to the right patient to the right leg, has unfolded.-After that, to relax tension on the right side, and then switch to the left to draw the right legs are in the Valley, or into the original position.4. to keep the rope.-Patients with sheep fabric pieces 1 and 2 out of the ankle. -The patient end of the sheep to slaughter out of the handlebar on either side. Then, pull the rope from the pulley to the Dee side.
การแปล กรุณารอสักครู่..
