1. risk control plans could not be found in the risk assessment of all I/J in Level 3 number 23 — do not conform to the requirements in 18-TS0-3 (Format-3)
1. There were no plans to control the risks in risk assessment of all of the I / J in Level 3 23, were not consistent. According to requirements, TS0-18-03 (Format-3).