1.1 check sopkrabueang before paving Check the type of tiles the color of the tiles of the same color or not. To raise the pressure in a crab that can be. If you find something wrong, ask the sales clerk immediately.1.2 cleaning the tile area.1.3 check level with thickness for cement and sand mixture (MORTAR) to tile between 3-5 cm. (Not including the thickness of the tile) If more or less than to make corrections (the front of the cement, sand, is subject to change based on the limits of the area, which is located in the discretion of the technician tile)Water-sand mortar mixer 1.4 on 1 l of water-cement ratio, 4 kg and 8 kg/10-sand (water consumption can be lowered if there is more moisture in the sand)1.5 brings the ingredients pour into the area to install tiles to adjust to level the tiles before installation.1.6 crabs along the arrows should tile goes in the same direction along the arrow logo, or symbol on the back of the tile adhesive is used to repel water on cement tiles or cement tile coordinates are based on lifting the tiles on mortar using a rubber hammer to gently tap it quickly:1.7 work placement and phaenkrabueang joints, except in sealing Groove at least 2-3 cm (Spacer devices should be used in the tiles aligned) POO when all is completed. Leave the cement set for approximately 72 hours before sealing.1.8 after the plaster set, make the sealing to prevent dirt residues by rongkrabueang. By cleaning the joints of the tiles by using a stiff brush or pointed steel. Then, use a tight sealing material to fill the plywood so that no air bubbles and cavity. If there is debris sealing overspilling, wipe out with cloth-dampened cloth before sealing the mortar curing.
การแปล กรุณารอสักครู่..