Solve a system of electrical work and checks. 1. prepare the walk or conduit system of electrical faek hundreds, 2 bedrooms, 2 bathrooms, all with check electrical system, all within the best conditions. 2. prepare to solve lighting system, kitchen with all the walking conduit. Check with the system, all in the best conditions. 3. to make changes to the breaker box and glue the plug with a pair of breakers, pumping out back of the House with the backing of pump in the best conditions. 4. check the electrical system, all the wires inside the House. 5. prepare the walk the Earth system with copper wire 1 × 10 mm. pipe, along with hundreds of Pasco, faek 1.80 meters down the Earth heard hammering with the background check system. 6. check all on the roof leaks. 7. preparation of the digging pipes PE 35, 24 mm. Metrics, VCT 3 × 2.5 conduit of power system, with all the new changes, new tubes and tube electrodes, all with out all the airport lighting. 8. to complete the installation of 8 × 10 inch box number 3 is selected in the right spot to make a lawn sign, all with access to all the airport lighting and power system check all airports. 9. to complete the installation of automatic doors, cement base, ready to install the new system, all new gear with the best systems checks. 10. the preparation of the 2 × 4 blocks, waterproof, embedded at the base gate with automatic sign-making fire with automatic doors systems checks. 11. to clean the air with lathon check collar operation system of air conditioning system offers the best lathon neck.* Note * -Work system mentioned above, the contractor has to ensure electrical and automatic door system for a period of 1 year from the date of delivery of the final task (except for the air conditioning system will be guaranteed only lathon neck 3 months only). -Price does not include any additional work that is not in this report 11.
การแปล กรุณารอสักครู่..