As the construction of dams, reservoir capacity 960 million cubic meters. The irrigation area and add the extension area, 30,000 144,500 Rai Rai.The benefits of the project. 1. a permanent water source to the consumer of various communities. In the district, Lopburi province and saraburi province. 2. is the water source for agriculture for irrigation areas will be born in the District of Lopburi province and saraburi province. The number of 174,500 Rai 3. is the water source for the original irrigation project in the eastern side of the Chao Praya River lower. Approximately 2,200,000 acres 4. help flood relief provided to the PA SAK River area in the District of Lopburi province and saraburi province and to help alleviate flooding make for lower down. 5. is the water source for the industry in the district, Lopburi province and saraburi province. 6. the reservoir will become a large source of fresh water fishing. 7. the supplementary water source to solve the shortage of water consumer in Bangkok. 8. an important tourist destination. 9. in order to help the economies of Lopburi province and saraburi province better.The objective, • In order to solve the problem of shortage of water for agriculture. To the consumer, and lack of water and other development support, especially in the dry season every year. • Alleviate the flooding problem in the PA SAK River basin and the Chao Phraya basin, lower.Project location The Nong Bua district, Lopburi industrial development.Period of construction. 2 years (2538-2551).The project budget. 7,831.000 million baht.
การแปล กรุณารอสักครู่..
