Dam catchment, the longest in the works of the King in order to prevent flooding. Day 2 started construction in December 2537 by the Royal Irrigation Department.
Soil dam water catchment is the longest in the country, along the Thai initiative of his Majesty, to prevent the flooding problems. Construction began on December 2 by 2537 (1994) irrigation
This is the dam soil water tank the longest in Thailand along initiated by His Majesty to prevent floods began construction in December 2 , 2537, the Department of Irrigation