Flood problems from factories in the preliminary in pinthong nikhom, Ticon and objectives in consultation with Ms. phin Phong (nikhom pin gold). In Re: solved the problem of flooding in pinthong nikhom factory where you can Pong phin explanation, aware of the flooding, said originally, the drainage of the estates will be cooled down to the ships Rails with 2 Rails off the drain by beam across the road of the highway, but because this interval is road improvement construction of Highway. The Department of Highways had made closing the drainage channel 1 is the result of draining problem estates. Not cooling water, it causes the problem.Nikhom also plan a gold pin to fix the internal drainage operation by nikhom dug pond เพื pond ongrap this restaurant, which can accommodate up to 6 cubic meter water facility, which is one of the urgent measures that are going to perform nikhom soon.Initially, you have to advise Pong phin, Ticon's and entrepreneurs affected by the flood this time State. Document complaints to clarify to damages caused by the floods this time to gather and assess the problem and lead to flooding problems and planning for the future at nikhom pinthong continue editing in progress. So learning to know and take action filed against nikhom pinthong.
การแปล กรุณารอสักครู่..