Minister of Dubai has revealed that, based on the concept that, inside the building, which will have 2 billion square feet of living space by typing each finished floor. With 3D printing press with 20-foot high after that, taken together, which takes a few weeks. Best furniture and structures inside, it will use the technology to print with 3D which used reinforced concrete. Gypsum Reinforced fiberglass and plastic. He said that this technique reduces costs down between 50 to 70 percent, and reduce labor costs down 50 to 80 percent of makrawang.
การแปล กรุณารอสักครู่..