Can be seen that the problem is not the cracks due to structural issues survey 12 cracks were found at pillar just 3 points only. The mast has to leave the joint will not pull times. The concrete surface is not broken out.
It can be seen that the problem is not a problem of structural cracks. The survey found cracks post 12 points, just three points only poles are spaced joint are not going to hold. Concrete is not broken out.
it can be seen that the problem is not the problem of crack structure. Because the survey pole 12 points found crack crack only 3 points only pole are ignored. Joint will not be pulled onto concrete surface so it does not break out.