The next target is the capacity of each of the products the way SKC for parts manufacturers, all of you, prepare for 2017, including the preparation container rotation (Returnable package), enough with the guys.
The next goal is the capacity for each product, the SKC cooperation component manufacturers to provide all capacity for 2017 to come to this. Preparation work includes container turnover (Returnable package) to be sufficient as well.
Next is the production of each product, the target is SKC cooperation manufacturers all to prepare the capacity for years 2017 to arrive. Preparation of container includes work circulation (Returnable package) enough?