The road project is a special 4-channel highway traffic. Total distance 184.013 km with access control by using a barrier fence, can access the project from different levels in the project. Checkpoint systems store entrance is a Closed System with no further security systems such as CCTV cameras. Emergency phones etc. Weight control with a standardized system of Dan kurz Where the old road crossing has been designed through careful service to minimize the impact on the community in the area, including service users through all 4 points is the service (Service Area), Highway 3 and highway service centre (Service Center) 1 point spread along the path project, each point is about 40-50 kilometers away.