Therefore, the The costs of production, thus the need to allocate using (Predetermined Overhead Rate). Which is calculated from the estimated cost of production of the period, divided by the estimated activity levels. The activities that are to be allocated are often commonly used include: Hours of direct labour costs direct labour hours, machine, the number of units of the item.
การแปล กรุณารอสักครู่..
