From 27 Apr 2559 Soil Lab system is closed (Phase 1) Production.To complete the system on the part of the Phase 2 Upgrade. When completed the Upgrade system. System and user manual
From the date of 27 Mei. 2559 to closed system Soil Lab (Phase 1) Production.The Upgrade system on the part of the Phase 2 in. When the Upgrade system completed.And manual system.